Skip to main content

DARC Bridge Project Progress - First Results

· 2 min read
Lidia Bisogno
Quality Manager at Inciflex

We are pleased to share the significant progress we have achieved with DARC Bridge in recent weeks. The project is proceeding according to the planned roadmap and we are obtaining very promising results.

Milestones Achieved

Since the launch phase, we have completed several important objectives:

System Architecture

The DARC Bridge architecture has been successfully defined and implemented. The system is structured in independent modules that ensure:

  • Scalability: ability to handle increasing order volumes
  • Reliability: retry mechanisms and error handling
  • Maintainability: modular and well-documented code
  • Security: multi-level authentication and authorization

First Operational Connectors

We have developed and tested the first connectors for integration with external systems:

  • Generic REST API connector
  • CSV/Excel file connector
  • Email import connector

Each connector has undergone rigorous quality testing to ensure correct data mapping.

Integration Testing

The quality team has conducted thorough testing on integration with Inciflex ERP:

  • ✅ Order data validation
  • ✅ Referential integrity checking
  • ✅ Item code management
  • ✅ Price and discount verification
  • ✅ Operation traceability

The test results were excellent, with a 98% success rate in simulated imports.

Monitoring Dashboard

The monitoring interface has been completed, allowing users to:

  • View import status in real-time
  • Track orders from external systems to Inciflex
  • Easily manage errors and anomalies
  • Generate detailed operation reports

Pilot User Feedback

A selected group of users has tested the beta version of DARC Bridge. The feedback received has been very positive:

"Automation has reduced order processing time by 75%" - Pilot User A

"The interface is intuitive and error handling is excellent" - Pilot User B

Next Goals

In the coming weeks we will focus on:

  1. Performance Optimization: improving response times for large volumes
  2. Additional Connectors: integration with other systems requested by customers
  3. Complete Documentation: user guides and technical documentation
  4. Release Preparation: final testing and user training

Acknowledgments

Special thanks go to the entire development team and our pilot users for their valuable contribution in making DARC Bridge a robust and reliable solution.


For more information about the project or to participate in the testing phase, please contact us.